Programmatic Approach to Development Projects
Programmatic
Approach to Development Projects:
Dr.
Engr. Md. Abdur Rashid
Director
(Research & Publication), NAPD
Blog
Posted: 14 October 2026
1. Understanding the Programmatic Approach
A
project is often seen as a standalone initiative—focused on delivering outputs
within a defined scope, resources, and timeline. But in modern development
practice, projects are increasingly managed under a programmatic approach.
This
means:
- Projects are integrated into broader national
or sectoral programs. In Bangladesh, there are 17 sectors.
- They are aligned with long-term
strategies, such as the Sustainable Development Goals (SDGs).
- Implementation is coordinated across multiple
stakeholders to avoid duplication.
- Outcomes are measured not only
at the project level but also at the program level, ensuring sustainability and systemic impact.
2. Case Study Example: Suppose, consider a project
for Hospital Establishment in Bagmara Upazila in Rajshahi district.
1) Program Context
The
hospital project in Bagmara Upazila was not conceived in isolation. It was
embedded within Bangladesh’s Health, Nutrition and Population Sector Program
(HNPSP), designed to expand healthcare access nationwide. In
Bangladesh’s Planning Commission, the health sector is formally managed under
the Health, Nutrition and Population Sector Program (HNPSP), which is part of the Ministry of Health
and Family Welfare’s planning framework. Within the Commission’s sectoral
divisions, it is generally referred to as the Health
Sector (Population, Nutrition, and Family Welfare), covering hospitals, clinics, family
planning, and public health infrastructure.
2)
Project Definition
- Objective: Establish a 150‑bed hospital to serve over 300,000
residents.
- Scope: Construction, medical equipment procurement, staff
recruitment, and community health awareness campaigns.
3) Programmatic Features
- Integration: Linked with maternal & child health programs,
digital health records, and rural doctor training.
- Resource Pooling: Funded by government allocations, donor agencies, and
local government contributions.
- Policy Linkage: Supports existing National Health Policy and Vision.
4) Project
Cycle through a Programmatic Lens
Carefully follow every stage of the
cycle looks to the program, not just the building site.
- Identification: Health gaps in Bagmara (high maternal mortality, lack
of emergency care).
- Preparation: Feasibility study, population survey, site selection.
- Appraisal: Reviewed by Planning Commission, aligned with HNPSP
indicators.
- Approval: ECNEC sanction under Ministry of Health program.
- Implementation:
- Phase 1: Civil works.
- Phase 2: Equipment
installation.
- Phase 3: Staff recruitment
& training.
- Monitoring: Integrated MIS reporting to DGHS.
- Evaluation: Impact measured at program level (e.g., reduction in maternal
mortality across Rajshahi division).
5) Outcomes
- Direct: 24/7 healthcare access for Bagmara residents.
- Indirect: Reduced patient load at Rajshahi Medical College
Hospital.
- Sustainability: Continuous funding and policy support through
national health programs.
3. Conclusion
The
Bagmara hospital project demonstrates how a programmatic approach transforms a construction initiative into
a sustainable development intervention. By embedding the project within a
national health program, the outcomes extend beyond infrastructure such strengthening
systems, improving equity, and advancing Bangladesh’s journey toward SDG‑3 (Good
Health and Well‑being).
Comments
Post a Comment